Irrigation performance begins before water reaches a sprinkler. The source, refill rate, useful storage, pump duty, controls, filtration, pipework and field demand all need to work together.

JK Irrigation designs, installs and upgrades water systems for golf courses, sports turf and complex sites. We assess each pump, tank and control arrangement in the context of the complete water path rather than as an isolated product.

Water storage tank installation forming part of a golf course irrigation project

What we deliver

  • New irrigation pump stations and replacement pump sets
  • Sectional tanks, break tanks, bases and connections
  • Lake, river, reservoir and borehole transfer systems
  • Stormwater collection and ditch-pump arrangements
  • Manifolds, isolation, non-return valves and pressure equipment
  • Level controls, float systems and custom control panels
  • Solar-powered water-transfer systems
  • Testing, commissioning, records and operator handover

Start with the real duty

Equipment selection starts with the available water, required flow and pressure, lift, route length, levels, pipe sizes, power and operating pattern. Access, filtration, solids risk, redundancy and future demand also affect the design.

A system can show pressure while still being unable to supply the required flow. Restrictions, undersized pipework, closed valves or increased demand may be the real problem, so fitting a larger pump is not automatically the answer.

Explore audits and technical system planning

Irrigation booster pump set with associated controls and pipework

Recent pumping and storage work

JK Irrigation installs and upgrades pump sets, water storage and transfer systems as part of complete irrigation projects. Explore examples of the work:

Explore more JK Irrigation projects

Break tanks and difficult water routes

A break tank can separate parts of a water system, provide a controlled suction supply and help manage long routes, elevation or several incoming sources. The tank, level controls and pump arrangement must be designed around the actual site.

  • Redbourn Golf Club: a break tank was installed following an identified limitation in the existing long supply route
  • Redlibbets Golf Club: lake, borehole-fill and storage supplies were brought together at a break tank before gravity feeding the new irrigation pump set
  • Dartford Golf Club: two tanks, a supporting base and lifting logistics were coordinated around restricted access
  • Shooters Hill Golf Club: a long-standing arrangement was replaced by a two-pump Lowara system with Hydrovar variable-speed control

Explore break tanks and multi-source systems

Reservoir, borehole and solar transfer

Transfer work may require separate pumping and controls from the irrigation pressure system. Source protection, float control, storage levels and the relationship between transfer demand and irrigation demand must be defined before installation.

At Abridge Golf Club, JK Irrigation worked on river transfer, reservoir controls, float controls, stormwater and ditch pumping.

West Herts Golf Club borehole rising-main renewal using a telehandler beside the course

  • West Herts Golf Club: renewal of the pump, steel rising main and controls serving an existing borehole, including a custom control panel
  • Mill Green Golf Club: a JK Irrigation designed and installed solar-powered system transferring water between lakes
  • Billingbear Park: a separate solar-powered lake-transfer arrangement with a custom frame for panels on the pump-house roof

View the West Herts project record

Explore solar-powered water transfer

Controls, water bodies and existing systems

JK Irrigation's in-house electrical capability allows pumps, panels, level controls and their connection to the irrigation network to be considered within the same delivery structure. Existing equipment can be investigated and retained where appropriate, with immediate faults separated from later improvement work.

JK Irrigation also installs controlled fountains and investigates lake and aeration systems. These are different interventions and are considered against the purpose of the water body, the identified issue and the site's electrical, hydraulic and environmental constraints.

Explore lakes, fountains and water management

Explore servicing and fault-finding

Water systems for sports facilities

At Bedford School, JK Irrigation was the designer and installer for a sports-turf system that included two 25,000-litre tanks, a Lowara pump system and approximately 2,000 metres of pipework. The project was independently reported by Turf Matters.

Read the Turf Matters project coverage

At St Dunstan's College Sports Ground, JK Irrigation installed a 74 cubic metre nominal-capacity tank, a 90 mm distribution backbone and six hand-watering connections for the sports grounds.

View the St Dunstan's College project record

Water infrastructure in practice

Ansty’s lake, tank and pump house seen from the air

Ansty Golf Centre: lake collection, a Franklin transfer pump, 74,000-litre tank, twin Lowara pumps and mains top-up.

Guildford Golf Club: twin Lowara pumping and four tanks with 80,000 litres of nominal combined storage.

Brampton Park Golf Club: a break tank, dual pumps and pump-house construction within a phased irrigation renewal.

St Dunstan’s College: a 74,000-litre tank and permanent distribution network for sports-ground watering.

Discuss a water-system project

Useful starting information includes the water source, existing storage, pump arrangement, distribution network, known problems and the outcome the site needs. Where records are incomplete, the first stage may be a survey or technical review before replacement equipment is specified.

Discuss water, pumping or storage

Pump house and break tank at Brampton Golf Club